RESUME A DBA Company to Advanced Home Exteriors Inc. Owner/President: Steve Mason 1925 Hoffman Road NE Salem, OR 97305 WA #ADVANHE996M6 Brief Summary of Company Company Founded: February 6th of 1993 to July 10th 2001 (Sole Proprietor) Steve Mason Contracting July 11th 2001 to Present ( S Corporation ) Advanced Home Exteriors Inc. CCB # 95541 2003 formed Advanced Native Construction as a DBA company to serve as a General Contracting firm to Native American Tribes. Years in Business: 11 years Member of the Better Business Bureau Zero workman compensation claims against Steve Mason Contracting, Advanced Home Exteriors Inc.and Advanced Native Construction. Average Number of Employees Number of Employed Ranges from 25 to 45 Work Experience and Qualifications New construction and remodeling of Tribal and Non Tribal Commercial and Residential structures: Includes excavation, concrete work, framing, siding, roofing, windows, painting, sheetrock, finish carpentry, plumbing, HVAC, electrical, masonry work, flooring, and cabinets. Many projects completed 100% utilizing in house staff of experienced tradesman. Advanced Native Construction and/or the staff of have completed hundreds of projects and have the manpower and resources to complete most projects. We have completed many Design/Build projects and most have been completed on time and on budget with no change orders. Goals for All Projects
The goal for Advanced Native Construction on all projects is to utilize Native Americans in all positions and support by subcontracting to Native American owned businesses. We strive to contact as many Native American businesses to bid our projects and to complete the project utilizing as many Native American Tradesman as available. We also work with T.E.R.O. organizations or Human Resource Departments to utilize local Native American Tradesmen and Laborers. Operational History, Employee History and Duties Owner/President: Steve Mason 1925 Hoffman Rd NE Previous Work Experience: In all construction trades since 1988, self-employed since 1993, previously Owner/President of Advanced Home Exteriors, Inc. Education: Completed High School at Waldport High, Waldport, OR and passed all Construction Board Requirements.
Project Manager: Mike Falk Previous Work Experience: Licensed contractor in OR and CA. Project Manager for Tomco Construction, Project Manager for CM Consulting, President of All Pro Environmental, Operations Manager for Envirodyne Corporation, Senior Project Manager for Riedel Environmental Services, Construction Specialist/Foreman for Galante Brothers Construction & Engineering. Education: 1975-1979 University of Oregon for Architecture/Engineering, OSHA Safety Training, OSHA 40 hour Hazardous Waste Operations and Emergency Response, OSHA Supervisor Safety Training, EPA Response Manager Training. Production Manager: Matthew Fleming Previous Work Experience: General Construction for the last ten years. Back hoe, cat and excavator operator, framing, roofing, siding window and door installations. Education: Graduate of Nestucca Union High School, Nestucca, OR. Regional Sales Manager: Rick Helseth Previous Work Experience: Marketing Director, Sales Manager and Consultant. Licensed Residential Structural Consultant and Licensed Residential Pest and Dry Rot. Education: Graduated High School in Fort Vancouver, WA. Attended Clark Community College, Rice University, Purdue University and University of Oregon. Job Superintendent/Marketing: Richard Gouin Previous Work Experience: General construction, contractor and marketing over 15 year period. Subcontractor on various tribal projects, Project Superintendent for Decko Construction and hands on experience as a pipe fitter, finish carpenter and laborer. Education: 1987-1989 South Puget Sound Community College, Shelton, WA and various septic system installer certifications. Job Superintendent: Tim Mason Previous Work Experience: General Contractor for five years. Worked at Siletz Housing Maintenance for 2 years. Education: Completed GED and took 2 years of college course in building construction technology at Portland Community College. Job Superintendent: Mike Miles Previous Work Experience: General Contractor in all fields. Owned carpet business for 10 years Education: Graduated High School at Lake Oswego, OR. Completed 1.5 years of college at Pasadena City College, Pasadena, CA. Job Superintendent: William Neilson Previous Work Experience: Project Superintendent for Tomco Construction Inc., Project Manager/Superintendent for Lanzce Construction and owner of Neilson Construction for 20 years. Education: 1969-1971 Spokane Falls Community College, Spokane, WA. Brief History of Projects Previously Completed or Working For: Siletz Housing Funded By: Insurance Project Name: Sillatchee Park / 54 Homes & Tollowa Court / 26 Units Description: Tore off existing LP siding and replaced with Hardy-Plank siding. Purchased and installed new Hardy panel soffits. Purchased and installed new 5/4 Cedar Trim and accessories. Replaced dry rot as needed and applied mold abatement protocol to all areas that were acceptable to mold and mildew. Removed and reinstalled all damaged lights, doorbells, gutters, downspouts, cables, wires house numbers and dryer vents. Time Frame: 2 Months. Contact: Howard Roy or Bill Sullivan with Siletz Housing Authority at (800) 922-1399 Ext 331 Contract Price: $559,000.00 Owner: Siletz Housing / Shannon Case Funded By: HUD Project Name: Storm Damage 28 Houses / Shannon Case Description: Recovered 2 roofs, patched and replaced variety roof shingles, ridge cap, replaced gutters, replaced windows, repaired sheetrock damage, cut and removed tree on house, repaired roof and soffit damage, cleaned up all debris from tree and spread new gravel. Time Frame Completed: 1 1/2 weeks Contact: Howard Roy with Siletz Housing Authority at (800) 922-1339 Ext-331 Contract Price: $17,639.00 Owner: Quail Court Management Funded By: By Owner Project Name: Brent Wood Apartments Description: Tore off existing siding and replaced with vinyl siding to meet engineered specs. Tore out any dry rot and mold and sprayed entire building with bleach solution and painted with kills to eliminate any mold growth. Rebuilt approximately 15 decks and recoated with rubberized coating. Also provided documentation of all work for court case due to law suit for prior installation. Time Frame Completed: 1 1/2 months Contact: Ricardo Berdichevsky with Quail Court Management at (503) 639-0224 Contract Price: $159,000.00 For: Tomco Construction Funded By: HUD Project Name: Yellow Hawk Behavioral Center Description: Applied a 60-mill membrane roof on new addition. Applied steel siding and aluminum soffits to new addition. Time Frame Completed: 2 weeks Contact: Mike Falk at (509) 534-4276 Contract Price: $28,000.00 Owner: Tomco Construction / Squaxin Island Tribe Funded By: HUD Project Name: Slocum Ridge 18 houses Description: Purchased and installed approximately 520 squares of 30-year architectural roofing with all accessories on new development. Time Frame Completed: As they were built or one house per day. Contact: Mike Falk at (509) 534-4276 Contract Price: $56,879.00 Owner: Siletz Housing / Dave Goodell Funded By: HUD Project Name: Dave Goodell Remodel Description: Tear off and replace siding, built two decks, repaired and retextured sheetrock through out entire house, painted entire house, laid new carpet through out house, installed new counter tops, fixed and re-surfaced old kitchen cabinets, built new kitchen island, installed new curtain drain around perimeter of house, regraded entire driveway and laid new rock, removed all black berries and bushes around house, installed new stove pipe through two stories and anchored to roof, a complete bathroom remodel with all the goodies, installed 3 new exterior doors and two new interior doors with all hardware and finish work, installed 13 new vinyl windows and one French door with new trim around all windows and doors, tore and re-sheeted entire roof and replaced with new 25 year architectural roofing, tore up all sub floor in kitchen and bathroom area and replaced with new to allow for new vinyl flooring, purchased and installed new hot water heater and plumbing for both hot water heater and bathroom, found and fixed all electrical problems and added new lighting, purchased and installed two new exterior decks approximately 300 sq and installed new pick a watt heaters to living room and kitchen. Time Frame Completed: 2 months Contact: Dave Goodell at (541) 444-2689 or Howard Roy with Siletz Housing at (541) 444 8331 Contract Price: $72,000.00 For: Umatilla Housing Authority Funded By: Insurance Project Name: 74 Houses / Storm Damage Description: Documented any and all damage with pictures for insurance company. Purchased and installed new roofing where needed, applied mastic caulking to any and all loose shingles to prevent future damage. Purchased and installed new vinyl siding where needed. Purchased and installed new gutter and down spouts where needed. Time Frame: 2 weeks Contact: Paul Rabb with Umatilla Housing Reservation at (541) 276-7544 Contract Price: $40,464.00 For: Mr. and Mrs. Upright Funded By: Home Owner Project Name: Airport Hanger and House Description: Tore off existing LP Siding and disposed of off site. Purchased and installed new vinyl siding and accessories. Purchased and installed new soffit and fascia system. Wrapped all exterior windows and doors with vinyl clad aluminum metal. Used diverter system throughout entire project. Time Frame: 2 Weeks Contact: Mr. or Mrs. Upright at (503) 838-4274 Contract Price: $28,597.00 For: Tomco Construction Funded By: HUD Project Name: Slocum Ridge Single Family / 21 Carports Description: Built 21 carports and installed new roofs, siding and all flashings for proper tie in to houses. Time Frame: 2 Weeks Contact: Mike Falk at (509) 534-4276 Contract Price: $34,000.00 Owner: Audrey Wagner / Coos Tribe Funded by: Home Owner Project Name: Audrey Wagner Farm House Description: Purchased and installed 6 new vinyl windows. Installed new vinyl soffit and fascia system around house and garage. Wrapped all exterior windows with PVC aluminum coil. Time Frame: 2 Days Contact: Audrey Wagner at (503) 390-4355 Contract Price: $5,032.00 Owner: Tamara Morrow / Siletz Housing Authority Funded By: Home Owner Project Name: Tamara Morrow Deck Description: Purchased and installed new outdoor deck with railing system. Tore out and removed old deck. Time Frame: 1 Week Contact: Tamara Morrow at (541) 547-4973 Contract Price: $3,578.00 Owner: Confederated Tribes of Coos, Lower Umpqua & Suislaw Indians (Clusha Indian Housing Authority) Funded By: HUD Project Name: Florence Domaschofsky Description: Tore off existing Clad wood siding and replaced with 8 inch OC Smart Panel Siding. Tore out and replaced all dry rot throughout entire mobile. Replaced three existing windows and cut one into bedroom. Removed and replaced 13 existing windows for proper siding application. Rescreened all existing windows. Painted entire house, shed, deck and hand railings with Sherman Williams Pro-Mar 200 paint. Leveled entire mobile home within 1/4 inch throughout entire house. Patched all existing cracks in drywall due to settling and touched up paint with computer match paint as necessary. Caulked and sealed skylights on roof to unable leaks. Replaced kitchen leaky faucet. Time Frame: 1 week Contact: Scott Hansen at (866) 744-9300 or Laurie Voshell at (541) 756-1376 Contract Price: $10,710.46
Owner: Siletz Housing Funded By: HUD Project Name: Stedco Apartments, bathroom remodel Description: Completed bathroom remodel including tub, flooring, vanity, cabinetry, painting, patching, faucets and dry rot. Time Frame: 2 Days Contact: Howard Roy at (541) 444-8331 Contract price: $3,578.00 For: Siletz Housing Authority / Tomco Construction Funded By: HUD Project Name: Tollowa Court Reside Description: Tore off existing LP Siding and disposed of off site. Installed new 15# ASTM felt to entire exterior of buildings. Purchased and installed new Hardy Plank siding (Cedar Mill 8 ¼†with a 7 “ reveal) to entire project. Removed and reinstalled all existing lights, cables, door bells, gutters, downspouts, satellite dishes, house numbers, dryer vents and basement entry doors. Fixed all dry rot through out entire project. Applied mold abatement protocol to all necessary areas. Time Frame: 1 ½ Months Contact: Howard Roy at (541) 444-8331 Contract Price: $179,000.00 Owner: Umatilla Reservation Housing Authority Funded By: HUD Project Name: 12-3 Siding, 19 Home reside # 653-04 Description: Tore off existing external boards for proper installation of new Grand Sierra Vinyl Siding. Wrapped all existing windows with PVC Vinyl Clad Aluminum Coil. Wrapped entire fascia system with PVC Vinyl Clad Aluminum Coil. Purchased and installed new Tyvek moisture barrier system throughout entire project. Installed Advanced Home Exteriors Inc, diverter system around all windows, doors, gutters, rakes, dryer vents, hose bibs and corners (call for details). Removed and reinstalled all existing lights, cables, door bells, gutters, downspouts, satellite dishes, house numbers, dryer vents and basement entry doors. Fixed all dry rot through out entire project. Applied mold abatement protocol to all necessary areas. Time Frame: 2 Months Contact: Paul Rabb at (541) 276-7544 Contract Price: $224,360.37 For: Tomco Construction Inc, Funded By: HUD Project Name: Slocum Ridge / 2 Houses Description: Purchased and installed new Cedar Mill Hardy Plank Siding and 30- year Architectural Roofing to newly built houses. Time Frame: 1 ½ Weeks Contact: Mike Falk at (509) 534-4276 Contract Price: $32,879.00 For: Tomco Construction Funded By: HUD Project Name: CTSI Child Care Center Description: Purchased and installed framing, siding, soffits, fascias, composition roofing, sheetrock, plumbing, excavating, painting, gutters, doors and hardware. Time Frame: 5 weeks Contact: Mike Falk at (509) 534-4276 Contract Price: $142,789.00 Owner: Squaxin Island Funding Agency: Tribe Project Name: Squaxin Island Education Remodel Description: Demo inside of building and relocate walls, including new electrical, data lines, sheetrock, doors, carpet, painting, acoustical ceiling tile and fire. Time Frame: 19 days Contact: Mike Poyer or Dan Neilands (360) 426-9781 Contract Price: $ 104,000.00 Owner: Yellow Hawk Health Clinic Funding Agency: Tribe Project Name: Yellow Hawk Health Clinic Remodel Description: Demo inside of building approx 4000 sf and relocate walls, including new electrical, data lines, sheetrock, doors, carpet, windows, wall paper, painting, acoustical ceiling tile and fire alarms. Time Frame: 45 days Contact: Tami Knight (541) 278-7524 Contract Price: 97,879.00 Status: Complete as of 9-10-04 Owner: Southern Puget Sound Housing Authority Funding Agency: HUD Project Name: Nisqually Tri-Plex Description: Design build 2850 sf Tri-plex with HGE Architects Time Frame: 3 months Contact: Bob Smith (360) 426-4641 Contract Price: 269,000.00 Status: In Framing Stage Scheduled for completion October 29th 2004 Architect: HGE Tom Stark (541) 269-1166 Owner: Southern Puget Sound Housing Authority Funding Agency: HUD Project Name: Skokomish 15 re-roofs Description: Tear off and replace all flashings, install 30 # felt and overlay with new 30year Pabco Roofing Time Frame: 3 weeks Contact: Bob Smith (360) 426-4641 Contract Price: 66,000.00 Status: Complete 25th Owner: Muckle Shoot Housing Authority Funding Agency: Tribe Project Name: Construction of Unit 1959 Description: To Build 1959 sf home from ground up including excavation and utilities. Time Frame: 3 months Contact: Roy Murphy (253) 833-7616 Contract Price: 154.000.00 Status: Letter of award as of August 25th, scheduled to start October 20th due to Permits, no scheduled for completion has been set yet due to tribe. Architect: Designs unlimited (253) 872-2580 Owner: Skokomish Indian Tribe Funding Agency: Tribe Project Name: Skokomish health center and expansion Description: Renovation of existing health clinic and 4000 sf expansion to existing health center, including all trades. Time Frame: 5 months Contact: Jesse Leighton (360) 426-4232 Contract Price: 647,000.00 Status: Letter of award as of August 31 2004, scheduled to start September 22nd and Scheduled for completion January 15th 2005. Architect: Shaman Architects, Planners and Designers (509) 246-9512 P.S. Ø We also contracted over 75 residential homes that included: framing, excavating, concrete, remodeling, siding, windows, roofing, drywall, plumbing, electrical, mechanical, finish carpentry, insulation, doors & hardware, water proofing and mold abatement.
HOME | CONTACT | QUALIFICATIONS | RESUME | GUIDELINES |
|
|